What could getting it right first save you?
Unclear requirements and late changes quietly eat into budgets, timelines and results. Enter your project and see what the research says is typically at stake, from a home renovation to a major project.
Your project
How to read this: the conservative figure counts only the cost of unclear requirements; the typical figure counts all the waste research finds on projects like yours. Both are research averages, not a quote or a guarantee, and your results will vary with the project and how it's run.
Why late changes cost more
The same mistake costs more to fix the later it's found. If fixing it while setting requirements costs 1 unit:
From world-famous projects to your own
Sydney Opera House and Berlin Brandenburg Airport
- Sydney Opera House: budgeted at A$7 million, finished at A$102 million and 10 years late. Construction began before the drawings were complete.
- Berlin Brandenburg Airport: budgeted at €2.83 billion, finished at €6.5 to €7.3 billion and 9 years late. Building carried on while the design kept changing, and the smoke extraction system had to be redesigned.
A $500,000 new business system
- 30% of new business systems go over budget and 22% finish late.
- The top causes are unexpected extra technology needs (55%) and expanded scope (51%): both requirements problems.
- Poor requirements typically waste 5.1% of project spend, and all poor project performance about 11.4%.
A $50,000 new service or process
- Small projects succeed far more often than large ones, yet 39% still run late, over budget or fall short.
- Across all projects, 11.4% of every dollar is wasted through poor project performance.
- Poor requirements alone typically waste 5.1% of project spend.
A $20,000 home renovation
- 72.7% of Australian renovators hit unexpected costs, and almost 60% have had to pause a renovation for money reasons.
- Redoing work averages 6.4% of contract value in direct costs and a further 5.9% in indirect costs, with client changes and gaps in the plans among the main causes.
Where the savings come from
Upfront thinking pays for itself. Across real development projects, the best results came from investing about 8% to 19% of effort in understanding the whole system first, and each extra dollar put into that thinking returned about $3.50.
Projects with strong systems engineering were nearly four times as likely to perform well: 57% compared with 15%. BMM puts that thinking in your hands, scaled to the size of the job.